7/26/2023 0 Comments Let it snow sweater design onlineInsert 1 marker at the beginning of the round (= mid-back) – THE YOKE IS MEASURED FROM HERE. Then work rib (purl 1, knit 1) in the round for 10 cm = 4”. Read CHANGING-STRAND TIP.Ĭast on 48-48-48-56-56-56 stitches with double pointed needles/circular needle size 10 MM = US 15 and DROPS Polaris. The sleeves are worked back and forth with circular needle and sewn together to finish. The neck, yoke and body are worked in the round with double pointed needles/circular needle, top down. each 8th stitch at the same time as binding off the yarn overs are bind off as normal stitches. If the edge is still tight, make 1 yarn over after approx. To avoid the bind-off edge being tight you can bind off with a larger size needle. Then work the increased stitches in stockinette stitch. Knit in the back loop (the yarn over twists to the left – no hole). Slip the yarn over off the left needle as if to knit and place it back the other way around, knit in the front loop (the yarn over twists to the right – no hole). On the next round work the yarn overs as follows: Increase by making 1 yarn over on each side of 1 knitted stitch (raglan-line), in each transition from body to sleeves (= 8 stitches increased on the round). Lay the first and last 15 cm = 6" over each other to give the normal yarn-thickness and continue working – this will leave no visible join. When changing balls, divide the old strand in 2 for the last 15 cm = 6" – cut off 1 length, do the same with the new strand. Yarn usage using an alternative yarn – Use our yarn converter here Yarn Groups A to F – Use the same pattern and change the yarn here Knitting tension – See how to measure it and why hereĪlternative Yarn – See how to change yarns here If you get too few stitches on 10 cm = 4”, change to a smaller needle size. If you get too many stitches on 10 cm = 4”, change to a larger needle size.
0 Comments
Leave a Reply. |